Paper detail

Minimax Optimal Estimation of Transport-Growth Pairs in Unbalanced Optimal Transport

Unbalanced optimal transport (UOT) extends classical optimal transport to measures with different total masses, but statistical guarantees for Monge-type estimation remain limited. We study unbalanced transport with quadratic cost and Kullback-Leibler marginal penalties and argue that the natural population target is not a map alone, but a transport-growth pair. Consequently, we develop two estimators for the transport-growth pairs under several setups: an optimal transport plan-based estimator for a general case, and a kernel-based estimator for a case with smooth densities. We also show that an error of the estimator achieves the minimax optimal rate by deriving a matching lower bound of the minimax risk. Our main technical contribution is a value-based stability reduction that converts perturbations of the UOT objective into transport and growth risks through a UOT gap condition. These results provide a statistical foundation for Monge-type estimation in unbalanced optimal transport.

preprint2026arXivOpen access

Signal facts

What is known right now

Open access3 authors4 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.