Paper detail

Training ML Models with Predictable Failures

Estimating how often an ML model will fail at deployment scale is central to pre-deployment safety assessment, but a feasible evaluation set is rarely large enough to observe the failures that matter. Jones et al. (2025) address this by extrapolating from the largest k failure scores in an evaluation set to predict deployment-scale failure rates. We give a finite-k decomposition of this estimator's forecast error and show that it has a built-in bias toward over-prediction in the typical case, which is the safety-favorable direction. This bias is offset when the evaluation set misses a rare high-failure mode that the deployment set contains, leaving the forecast to under-predict at deployment scale. We propose a fine-tuning objective, the forecastability loss, that addresses this failure mode. In two proof-of-concept experiments, a language-model password game and an RL gridworld, fine-tuning substantially reduces held-out forecast error while preserving primary-task capability and achieving safety similar to that of supervised baselines.

preprint2026arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.