Paper detail

The CMS Outer Tracker for the High Luminosity LHC upgrade

The High Luminosity Large Hadron Collider (HL-LHC) at CERN is expected to collide protons at a centre-of-mass energy of 14\,TeV and to reach the unprecedented peak instantaneous luminosity of 5\,$-$\,7.5\,x\,$10^{34}$\,cm$^{-2}$s$^{-1}$ with an average number of pileup events of 140\,$-$\,200. This will allow the ATLAS and CMS experiments to collect integrated luminosities up to 3000\,$-$\,4000\,fb$^{-1}$ during the project lifetime. To cope with this extreme scenario the CMS detector will be substantially upgraded before starting the HL-LHC, with a plan known as CMS Phase-2 upgrade. The CMS Tracker detector will have to be replaced in order to fully exploit the delivered luminosity and cope with the demanding operating conditions. The new detector will provide robust tracking as well as input for the first level trigger. This paper is focused on the replacement of the CMS Outer Tracker system, describing the new layout and the technological choices together with some highlights of module assembly and quality assurance aspects.

preprint2020arXivOpen access

Signal facts

What is known right now

Open access1 author1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.