Paper detail

The AIDA-2020 TLU: a Flexible Trigger Logic Unit for Test Beam Facilities

The AIDA-2020 Trigger Logic Unit (TLU) has been designed to be a flexible and easily configurable unit to provide trigger and control signals to devices employed during test beams, integrating them with the beam telescope. The most recent iteration of the TLU (v1E) has been re-designed within the AIDA-2020 project to integrate with hardware used in beam facilities. Configuration and communication with the TLU are performed over Ethernet. It can be employed as a stand-alone unit or be deployed as part of the EUDAQ2 data acquisition framework, which allows it to connect to a wide range of LHC readout systems. The TLU can operate with a sustained particle rate of 1 MHz and with instantaneous rates up to 20 MHz. In the current firmware iteration, the unit can time-stamp incoming signals with a resolution of 1.5 ns. The hardware, firmware and software designs of the TLU are freely accessible and benefit from constant inputs and upgrades from experienced users. TLU units have already been deployed successfully in beam lines at CERN and DESY.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.