First full cool down of the SPIRAL 2 superconducting LINAC

SPIRAL 2 is a high intensity heavy ions beams accelerator project that has been going on for more than 10 years now. Countless efforts in different disciplines made it what it is today. One of the most important steps after the set up of the different equipments has been the very first full cool down of the superconducting cavities in an accelerator operation type configuration. While this has been a major achievement for the SPIRAL 2 teams, it also hi-lighted new challenges and constraints that would have to be addressed in order to have a high availability rate of the beam from the cryogenics side. This paper retraces this particular episode.

preprint2021arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.