Source author record

Arnaud Trudel

Arnaud Trudel appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Advanced cryogenic process control and monitoring for the SPIRAL2 superconducting LINAC

SPIRAL2 is a superconducting accelerator for protons, deuterons and heavy ions delivering a maximum beam power of 200 kW at 40 MeV (for deuteron beams). 26 superconducting quarter wave cavities are operated at 4.4 K, plunged in a liquid helium bath with a drastic phase separator pressure control. Previous years have seen the development of advanced process control for cryogenics allowing to cope with high heat load dynamics thanks to an automatic heat dissipation compensation and a model based control. The latter is based on models, using the Simcryogenics library, optimized and linearised in the Programmable Logic Controllers. The SPIRAL2 operation has demonstrated that such control allows to keep the specified conditions for RF and beam operation even at levels of heat load dissipation approaching the physical limits of the cryogenic system. These developments allowed to synthesise a virtual observer of the dynamic heat load dissipated by the cavities. The present paper summarises the development of such observer based on the physical thermodynamic model and on machine learning techniques.

preprint2021arXiv

First full cool down of the SPIRAL 2 superconducting LINAC

SPIRAL 2 is a high intensity heavy ions beams accelerator project that has been going on for more than 10 years now. Countless efforts in different disciplines made it what it is today. One of the most important steps after the set up of the different equipments has been the very first full cool down of the superconducting cavities in an accelerator operation type configuration. While this has been a major achievement for the SPIRAL 2 teams, it also hi-lighted new challenges and constraints that would have to be addressed in order to have a high availability rate of the beam from the cryogenics side. This paper retraces this particular episode.