Paper detail

EV Dispatch Control for Supplementary Frequency Regulation Considering the Expectation of EV Owners

Electric Vehicles (EVs) are promising to provide frequency regulation services due to their fast regulating characteristics. However, when EVs participate in Supplementary Frequency Regulation (SFR), it is challenging to simultaneously achieve the dispatch of the control center and the expected State of Charge (SOC) levels of EV batteries. To solve this problem, in this paper we propose a Vehicle-to-Grid (V2G) control strategy, in which an uncertain dispatch is implemented in the control center without detailed EV charging/discharging information. The regulation from the control center is achieved by allocating the regulation task within the frequency regulation capacity (FRC) of EVs. The expected SOC levels of EV batteries are guaranteed by a real-time correction of their scheduled V2G power in EV charging stations. Simulations on an interconnected two-area power system validate the effectiveness of the proposed V2G control in achieving both the frequency regulation and the expected SOC levels of EVs.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access6 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.