Paper detail

A New Metric for Lumpy and Intermittent Demand Forecasts: Stock-keeping-oriented Prediction Error Costs

Forecasts of product demand are essential for short- and long-term optimization of logistics and production. Thus, the most accurate prediction possible is desirable. In order to optimally train predictive models, the deviation of the forecast compared to the actual demand needs to be assessed by a proper metric. However, if a metric does not represent the actual prediction error, predictive models are insufficiently optimized and, consequently, will yield inaccurate predictions. The most common metrics such as MAPE or RMSE, however, are not suitable for the evaluation of forecasting errors, especially for lumpy and intermittent demand patterns, as they do not sufficiently account for, e.g., temporal shifts (prediction before or after actual demand) or cost-related aspects. Therefore, we propose a novel metric that, in addition to statistical considerations, also addresses business aspects. Additionally, we evaluate the metric based on simulated and real demand time series from the automotive aftermarket.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.