Source author record

Zuyi Li

Zuyi Li appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

8works
4topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

8 published item(s)

preprint2020arXiv

LfEdNet: A Task-based Day-ahead Load Forecasting Model for Stochastic Economic Dispatch

Load forecasting is one of the most important and studied topics in modern power systems. Most of the existing researches on day-ahead load forecasting try to build a good model to improve the forecasting accuracy. The forecasted load is then used as the input to generation scheduling with the ultimate goal of minimizing the cost of generation schedules. However, existing day-ahead load forecasting models do not consider this ultimate goal at the training/forecasting stage. This paper proposes a task-based day-ahead load forecasting model labeled as LfEdNet that combines two individual layers in one model, including a load forecasting layer based on deep neural network (Lf layer) and a day-ahead stochastic economic dispatch (SED) layer (Ed layer). The training of LfEdNet aims to minimize the cost of the day-ahead SED in the Ed layer by updating the parameters of the Lf layer. Sequential quadratic programming (SQP) is used to solve the day-ahead SED in the Ed layer. The test results demonstrate that the forecasted results produced by LfEdNet can lead to lower cost of day-ahead SED while maintaining a relatively high forecasting accuracy.

preprint2016arXiv

A Decomposition Based Approach for Solving a General Bilevel Linear Programming

Bilevel optimization has been widely used in decision-making process. However, there still lacks an efficient algorithm to determine an optimal solution of a bilevel optimization problem, especially for a large-size problem. To bridge the gap, this paper proposes an efficient decomposition algorithm for a general bilevel linear programming(GBLP). The simulation results on large-size testing system demonstrate its correctness and efficiency.

preprint2016arXiv

Robust Coordinated Transmission and Generation Expansion Planning Considering Ramping Requirements and Construction Periods

Two critical issues have arisen in transmission expansion planning with the rapid growth of wind power generation. First, severe power ramping events in daily operation due to the high variability of wind power generation pose great challenges to multi-year planning decision making. Second, the long construction periods of transmission lines may not be able to keep pace with the fast growing uncertainty due to the increasing integration of renewable energy generation. To address such issues, we propose a comprehensive robust planning model considering different resources, namely, transmission lines, generators, and FACTS devices. Various factors are taken into account, including flexibility requirement, construction period, and cost. We construct the hourly net load ramping uncertainty (HLRU) set to characterize the variation of hourly net load including wind power generation, and the annual net load duration curve uncertainty (LDCU) set for the uncertainty of normal annual net load duration curve. This results in a two-stage robust optimization model with two different types of uncertainty sets, which are decoupled into two different sets of subproblems to make the entire solution process tractable. Numerical simulations with real-world data show that the proposed model and solution method are effective to coordinate different flexible resources, rendering robust expansion planning strategies.

preprint2016arXiv

Uncertainty Marginal Price, Transmission Reserve, and Day-ahead Market Clearing with Robust Unit Commitment

The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. These uncertainties have to be accommodated by flexible re- sources (i.e. upward and downward generation reserves). In this paper, a novel concept, Uncertainty Marginal Price (UMP), is proposed to price both the uncertainty and reserve. At the same time, the energy is priced at Locational Marginal Price (LMP). A novel market clearing mechanism is proposed to credit the gener- ation and reserve and to charge the load and uncertainty within the Robust Unit Commitment (RUC) in the Day-ahead market. We derive the UMPs and LMPs in the robust optimization framework. UMP helps allocate the cost of generation reserves to uncertainty sources. We prove that the proposed market clearing mechanism leads to partial market equilibrium. We find that transmission reserves must be kept explicitly in addition to generation reserves for uncertainty accommodation. We prove that transmission reserves for ramping delivery may lead to Financial Transmission Right (FTR) underfunding in existing markets. The FTR underfunding can be covered by congestion fund collected from uncertainty payment in the proposed market clearing mechanism. Simulations on a six-bus system and the IEEE 118-bus system are performed to illustrate the new concepts and the market clearing mechanism.

preprint2015arXiv

Impacts of Bad Data on the PMU based Line Outage Detection

Power systems become more prone to cyber-attacks due to the high integration of information technologies. In this paper, we demonstrate that the outages of some lines can be masked by injecting false data into a set of measurements. The success of the topology attack can be guaranteed by making that: 1)the injected false data obeys KCL and KVL to avoid being detected by the bad data detection program in the state estimation; 2)the residual is increased such that the line outage cannot be detected by PMU data. A quadratic programming problem is set up to determine the optimal attack vector that can maximize the residual of the outaged line. The IEEE 39-bus system is used to demonstrate the masking scheme.

preprint2015arXiv

Market Clearing for Uncertainty, Generation Reserve, and Transmission Reserve--Part II:Case Study

In Part II of this two-part paper, we analyze the marginal prices derived in Part I of this two-part paper within a robust optimization framework. The load and generation are priced at Locational Marginal Price (LMP) while the uncertainty and generation reserve are priced at Uncertainty Marginal Price(UMP). The Financial Transmission Right (FTR) underfunding is demonstrated when there is transmission reserve. A comparison between traditional reserve price and UMP is presented. We also discuss the incentives for market participants within the new market scheme.

preprint2015arXiv

Pricing the Ramping Reserve and Capacity Reserve in Real Time Markets

The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. In order to maintain system reliability and security, electricity market operators need to keep certain reserves in the Security-Constrained Economic Dispatch (SCED) problems. A new concept, deliverable generation ramping reserve, is proposed in this paper. The prices of generation ramping reserves and generation capacity reserves are derived in the Affine Adjustable Robust Optimization framework. With the help of these prices, the valuable reserves can be identified among the available reserves. These prices provide crucial information on the values of reserve resources, which are critical for the long-term flexibility investment. The market equilibrium based on these prices is analyzed. Simulations on a 3-bus system and the IEEE 118-bus system are performed to illustrate the concept of ramping reserve price and capacity reserve price. The impacts of the reserve credit on market participants are discussed.

preprint2015arXiv

Robust Integration of High-level Dispatchable Renewables in Power System Operation

The increasing penetration of Renewable Energy Sources (RES) requires more Flexibility Resources (FR), generally thermal units and storages, must be kept in the system to accommodate the uncertainties from RES. The challenge is how the system can survive when the RES level is very high. In this paper, RESs are considered as full-role market participants. They can bid in the day-ahead market, and the powers they deliver to the market are controllable up to their maximum available powers. Therefore, RESs are effectively dispatchable and can function as FR providers. To integrate dispatchable renewables, a two-stage robust Unit Commitment (UC) and dispatch model is established. In the first stage, a base UC and dispatch is determined. In the second stage, all FRs including RESs are used to accommodate the uncertainties, which is a Mixed-Integer Programming (MIP) problem. It is proved that the solution to the max-min problem can be identified directly whether the strong duality holds or not for the inner minimization problem. The solution robustness is guaranteed by including only one extra scenario. Numerical results show the effectiveness of the proposed model and its advantages over the traditional robust UC model with high level RES penetration.