Source author record

Yinyin Ge

Yinyin Ge appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2016arXiv

Uncertainty Marginal Price, Transmission Reserve, and Day-ahead Market Clearing with Robust Unit Commitment

The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. These uncertainties have to be accommodated by flexible re- sources (i.e. upward and downward generation reserves). In this paper, a novel concept, Uncertainty Marginal Price (UMP), is proposed to price both the uncertainty and reserve. At the same time, the energy is priced at Locational Marginal Price (LMP). A novel market clearing mechanism is proposed to credit the gener- ation and reserve and to charge the load and uncertainty within the Robust Unit Commitment (RUC) in the Day-ahead market. We derive the UMPs and LMPs in the robust optimization framework. UMP helps allocate the cost of generation reserves to uncertainty sources. We prove that the proposed market clearing mechanism leads to partial market equilibrium. We find that transmission reserves must be kept explicitly in addition to generation reserves for uncertainty accommodation. We prove that transmission reserves for ramping delivery may lead to Financial Transmission Right (FTR) underfunding in existing markets. The FTR underfunding can be covered by congestion fund collected from uncertainty payment in the proposed market clearing mechanism. Simulations on a six-bus system and the IEEE 118-bus system are performed to illustrate the new concepts and the market clearing mechanism.

preprint2015arXiv

Market Clearing for Uncertainty, Generation Reserve, and Transmission Reserve--Part II:Case Study

In Part II of this two-part paper, we analyze the marginal prices derived in Part I of this two-part paper within a robust optimization framework. The load and generation are priced at Locational Marginal Price (LMP) while the uncertainty and generation reserve are priced at Uncertainty Marginal Price(UMP). The Financial Transmission Right (FTR) underfunding is demonstrated when there is transmission reserve. A comparison between traditional reserve price and UMP is presented. We also discuss the incentives for market participants within the new market scheme.