Robust Coordinated Transmission and Generation Expansion Planning Considering Ramping Requirements and Construction Periods

Two critical issues have arisen in transmission expansion planning with the rapid growth of wind power generation. First, severe power ramping events in daily operation due to the high variability of wind power generation pose great challenges to multi-year planning decision making. Second, the long construction periods of transmission lines may not be able to keep pace with the fast growing uncertainty due to the increasing integration of renewable energy generation. To address such issues, we propose a comprehensive robust planning model considering different resources, namely, transmission lines, generators, and FACTS devices. Various factors are taken into account, including flexibility requirement, construction period, and cost. We construct the hourly net load ramping uncertainty (HLRU) set to characterize the variation of hourly net load including wind power generation, and the annual net load duration curve uncertainty (LDCU) set for the uncertainty of normal annual net load duration curve. This results in a two-stage robust optimization model with two different types of uncertainty sets, which are decoupled into two different sets of subproblems to make the entire solution process tractable. Numerical simulations with real-world data show that the proposed model and solution method are effective to coordinate different flexible resources, rendering robust expansion planning strategies.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access7 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.