Researcher profile

Weitian Tong

Weitian Tong contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
1topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint

As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. [3] recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. [3]. More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial-time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant.

preprint2022arXiv

An efficient polynomial-time approximation scheme for parallel multi-stage open shops

Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop scheduling and parallel machine scheduling problems. Given m identical k-stage open shops and a set of n jobs, we aim to process all jobs on these open shops with the minimum makespan, i.e., the completion time of the last job, under the constraint that job preemption is not allowed. We present an efficient polynomial-time approximation scheme (EPTAS) for the case when both m and k are constant. The main idea for our EPTAS is the combination of several categorization, scaling, and linear programming rounding techniques. Jobs and/or operations are first scaled and then categorized carefully into multiple types so that different types of jobs and/or operations are scheduled appropriately without increasing the makespan too much.