A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint

preprint2022arXivOpen access

Abstract

As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. [3] recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. [3]. More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial-time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.