Source author record

R. Ruber

R. Ruber appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

6works
4topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

6 published item(s)

preprint2022arXiv

Design of a Canted-cosine-theta orbit corrector for the High Luminosity LHC

The High Luminosity LHC requires dipole orbit correctors grouped in double aperture magnet assemblies. They provide a field of 3.1 T at 100 A in an aperture of 70 mm. The current standard design is a classical cosine-theta layout made with ribbon cable. However, the electric insulation of the ribbon cable is not radiation-resistant enough to withstand the radiation load expected in the coming years of LHC operation. A new design, based on a radiation-resistant cable with polyimide insulator, that can replace the existing orbit correctors at their end-of-life, is needed. The challenge is to design a magnet that fits directly into the existing positions and that can operate with the same busbars, passive quench protection, and power supplies as existing magnets. We propose a self-protected canted-cosine-theta (CCT) design. We take the opportunity to explore new concepts for the CCT design to produce a cost-effective and high-quality design with a more sustainable use of resources. The new orbit corrector design meets high requirements on the field quality while keeping within the same mechanical volume and maximum excitation current. A collaboration of Swedish universities and Swedish industry has been formed for the development and production of a prototype magnet following a concurrent engineering (CE) methodology to reduce the time needed to produce a functional CCT magnet. The magnet has a 1 m long CCT dipole layout consisting of two coils. The superconductor is a commercially available 0.33 mm wire with polyimide insulation in a 6-around-1 cable. The channels in the coil formers, that determine the CCT layout, allow for 2 x 5 cable layers. A total of 70 windings makes that the coil current can be kept below 100 A. We will present the detailed design and preliminary quench simulations.

preprint2022arXiv

European Strategy for Particle Physics -- Accelerator R&D Roadmap

The 2020 update of the European Strategy for Particle Physics emphasised the importance of an intensified and well-coordinated programme of accelerator R&D, supporting the design and delivery of future particle accelerators in a timely, affordable and sustainable way. This report sets out a roadmap for European accelerator R&D for the next five to ten years, covering five topical areas identified in the Strategy update. The R&D objectives include: improvement of the performance and cost-performance of magnet and radio-frequency acceleration systems; investigations of the potential of laser / plasma acceleration and energy-recovery linac techniques; and development of new concepts for muon beams and muon colliders. The goal of the roadmap is to document the collective view of the field on the next steps for the R&D programme, and to provide the evidence base to support subsequent decisions on prioritisation, resourcing and implementation.

preprint2022arXiv

The CLIC project

The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e$^+$e$^-$-collider under development by the CLIC accelerator collaboration, hosted by CERN. The CLIC accelerator has been optimised for three energy stages at centre-of-mass energies 380 GeV, 1.5 TeV and 3 TeV. CLIC uses a novel two-beam acceleration technique, with normal-conducting accelerating structures operating in the range of 70-100 MV/m. The report describes recent achievements in accelerator design, technology development and prototyping, system tests and beam tests. Large-scale CLIC-specific beam tests have taken place, for example, at the CLIC Test Facility CTF3 at CERN, at the Accelerator Test Facility ATF2 at KEK, at the FACET facility at SLAC and at the FERMI facility in Trieste. Together, they demonstrate that all implications of the CLIC design parameters are well understood and reproducible in beam tests and prove that the CLIC performance goals are realistic. The implementation of CLIC near CERN has been investigated. Focusing on a staged approach starting at 380 GeV, this includes civil engineering aspects, electrical networks, cooling and ventilation and installation scheduling, transport. All CLIC studies have put emphasis on optimising cost and energy efficiency, and the resulting power and cost estimates are reported. The report follows very closely the accelerator project description in the CLIC Summary Report for the European Particle Physics Strategy update 2018-19. Detailed studies of the physics potential and detector for CLIC, and R&D on detector technologies, have been carried out by the CLIC detector and physics (CLICdp) collaboration. CLIC provides excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.

preprint2020arXiv

Contamination and conditioning of the prototype double spoke cryomodule for European Spallation Source

A superconducting Double Spoke Resonator (DSR) is the technology of choice in a low energy section of a high power proton linear accelerator. At the FREIA laboratory in Uppsala University, we have tested two DSRs in a prototype cryomodule for the European Spallation Source (ESS) project. It showed that the conditioning process of these cavity packages would be the key for the series production tests. In this paper, we present the conditioning procedure that we developed, and also describe the results with a special focus on the cross-contamination observed between two high-power couplers. This study defines a standard conditioning recipe for the series DSR production for ESS and also for future similar projects in the world.

preprint2013arXiv

A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper

Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseline program for the European Spallation Source linac is that it will be fully operational at 5 MW average power by 2022, producing 2 GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron production and 14 pulses/s for neutrino production. Furthermore, because of the high current required in the pulsed neutrino horn, the length of the pulses used for neutrino production needs to be compressed to a few $μ$s with the aid of an accumulator ring. A long baseline experiment using this Super Beam and a megaton underground Water Cherenkov detector located in existing mines 300-600 km from Lund will make it possible to discover leptonic CP violation at 5 $σ$ significance level in up to 50% of the leptonic Dirac CP-violating phase range. This experiment could also determine the neutrino mass hierarchy at a significance level of more than 3 $σ$ if this issue will not already have been settled by other experiments by then. The mass hierarchy performance could be increased by combining the neutrino beam results with those obtained from atmospheric neutrinos detected by the same large volume detector. This detector will also be used to measure the proton lifetime, detect cosmological neutrinos and neutrinos from supernova explosions. Results on the sensitivity to leptonic CP violation and the neutrino mass hierarchy are presented.

preprint2013arXiv

Effects of rf breakdown on the beam in the Compact Linear Collider prototype accelerator structure

Understanding the effects of RF breakdown in high-gradient accelerator structures on the accelerated beam is an extremely relevant aspect in the development of the Compact Linear Collider (CLIC) and is one of the main issues addressed at the Two-beam Test Stand at the CLIC Test Facility 3 at CERN. During a RF breakdown large electro-magnetic fields are generated and produce parasitic magnetic fields which interact with the accelerated beam affecting its orbit and energy. We discuss here measurements of such effects observed on an electron beam accelerated in a CLIC prototype structure. Measurements of the trajectory of bunch-trains on a nanosecond time-scale showed fast changes in correspondence of breakdown which we compare with measurements of the relative beam spots on a scintillating screen. We identify different breakdown scenarios for which we offer an explanation based also on measurements of the power at the input and output ports of the accelerator structure. Finally we present the distribution of the magnitude of the observed changes in the beam orbit and we discuss its correlation with RF power and breakdown location in the accelerator structure.