Source author record

A. Faus-Golfe

A. Faus-Golfe appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

5works
2topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

5 published item(s)

preprint2022arXiv

European Strategy for Particle Physics -- Accelerator R&D Roadmap

The 2020 update of the European Strategy for Particle Physics emphasised the importance of an intensified and well-coordinated programme of accelerator R&D, supporting the design and delivery of future particle accelerators in a timely, affordable and sustainable way. This report sets out a roadmap for European accelerator R&D for the next five to ten years, covering five topical areas identified in the Strategy update. The R&D objectives include: improvement of the performance and cost-performance of magnet and radio-frequency acceleration systems; investigations of the potential of laser / plasma acceleration and energy-recovery linac techniques; and development of new concepts for muon beams and muon colliders. The goal of the roadmap is to document the collective view of the field on the next steps for the R&D programme, and to provide the evidence base to support subsequent decisions on prioritisation, resourcing and implementation.

preprint2022arXiv

The CLIC project

The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e$^+$e$^-$-collider under development by the CLIC accelerator collaboration, hosted by CERN. The CLIC accelerator has been optimised for three energy stages at centre-of-mass energies 380 GeV, 1.5 TeV and 3 TeV. CLIC uses a novel two-beam acceleration technique, with normal-conducting accelerating structures operating in the range of 70-100 MV/m. The report describes recent achievements in accelerator design, technology development and prototyping, system tests and beam tests. Large-scale CLIC-specific beam tests have taken place, for example, at the CLIC Test Facility CTF3 at CERN, at the Accelerator Test Facility ATF2 at KEK, at the FACET facility at SLAC and at the FERMI facility in Trieste. Together, they demonstrate that all implications of the CLIC design parameters are well understood and reproducible in beam tests and prove that the CLIC performance goals are realistic. The implementation of CLIC near CERN has been investigated. Focusing on a staged approach starting at 380 GeV, this includes civil engineering aspects, electrical networks, cooling and ventilation and installation scheduling, transport. All CLIC studies have put emphasis on optimising cost and energy efficiency, and the resulting power and cost estimates are reported. The report follows very closely the accelerator project description in the CLIC Summary Report for the European Particle Physics Strategy update 2018-19. Detailed studies of the physics potential and detector for CLIC, and R&D on detector technologies, have been carried out by the CLIC detector and physics (CLICdp) collaboration. CLIC provides excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.

preprint2012arXiv

Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.

preprint2012arXiv

Proposal for Single-Bunch Collimator Wakefield Measurements at SLAC ESTB

Collimator wakefields in the Beam Delivery System (BDS) of future linear colliders, such as the International Linear Collider (ILC) and the Compact Linear Collider (CLIC), can be an important source of emittance growth and beam jitter amplification, consequently degrading the luminosity. Therefore, a better understanding of collimator wakefield effects is essential to optimise the collimation systems of future linear colliders in order to minimise wakefield effects. In the past, measurements of single-bunch collimator wakefields have been carried out at SLAC with the aim of benchmarking theory, numerical calculations and experiments. Those studies revealed some discrepancies between the measurements and the theoretical models. New experimental tests using available beam test facilities, such as the End Station A Test Beam (ESTB) at SLAC, would help to improve our understanding on collimator wakefields. ESTB will provide the perfect test bed to investigate collimator wakefields for different bunch length conditions, relevant for both ILC (300 micrometers nominal bunch length) and CLIC (44 micrometers nominal bunch length) studies. Here we propose to perform new experimental tests of collimator wakefield effects on electron/positron beams at SLAC ESTB.

preprint2006arXiv

Optimization of the e-e- option for the ILC

The e-e- running mode is one of the interesting physics options at the International Linear Collider (ILC). The luminosity for e-e- collisions is reduced by the beam-beam effects. The resulting beamstrahlung energy loss and beam-beam deflection angles as function of the vertical transverse offset are different compared to the e+e- collisions. In this paper, the dependence of these observables with the offset for different beam sizes has been analyzed to optimize performances for the e-e- mode, taking into account the requirements of the beam-beam deflection based intra-train feedback system. A first study of the implications for the final focus and extraction line optics is also presented for the cases of the 20 mrad and 2 mrad ILC base line crossing angle geometries.