Source author record

M. A. Fraser

M. A. Fraser appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

3works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2019arXiv

SPS Beam Dump Facility -- Comprehensive Design Study

The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment. Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.

preprint2010arXiv

Beam Dynamics Investigation of the 101.28 MHz IH Structure as Injector for the HIE-ISOLDE SC Linac

The first phase of the HIE-ISOLDE project at CERN consists of a superconducting (SC) linac upgrade in order to increase the energy of post-accelerated radioactive ion beams from 2.8 MeV/u to over 10 MeV/u (for A/q = 4.5). In preparation for the upgrade, we present beam dynamics studies of the booster section of the normal conducting (NC) REX-ISOLDE linac, focused on the longitudinal development of the beam in the 101.28 MHz Interdigital H-mode Structure (IHS), employing a Combined Zero Degree Structure (KONUS), pulsing at a high gradient of over 3 MV/m. The evolution of the transverse emittance in the SC linac depends critically on the injected longitudinal phase space distribution of particles from the existing linac and, with a better understanding of the beam dynamics upstream, the performance of the upgrade can be optimised. Data taken during the commissioning phase of the REX-ISOLDE linac is analysed to understand the properties of the beam in the booster and combined with beam dynamics simulations which include the realistic fields of the IHS, determined from both simulation and perturbation measurement.

preprint2010arXiv

Beam Dynamics Studies of the REX-ISOLDE Linac in Preparation for its Role as Injector for the HIE-ISOLDE SC Linac at CERN

The superconducting (SC) High Intensity and Energy (HIE) ISOLDE linac will replace most of the existing accelerating infrastructure of the Radioactive ion beam EXperiment (REX) at CERN, however, the 101.28 MHz RFQ and 5 MV IH cavity will remain in the role of injector for the upgrade, boosting the beam up to an energy of 1.2 MeV/u. We present the results of a beam dynamics investigation of the injector focused most critically on matching the longitudinal beam parameters from the RFQ to the SC machine, which is complicated largely by the IH cavity employing a Combined Zero Degree (KONUS) beam dynamics design. The longitudinal beam parameters at the RFQ are reconstructed from measurement using the three gradient method and combined with beam dynamics measurements and simulations of the IH structure to design the matching section for the SC linac.