Researcher profile

G. De Robertis

G. De Robertis contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 21 - EmergingVerification L1Unclaimed author
6works
0followers
2topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

6 published item(s)

preprint2026arXiv

Beam test studies for a SiPM-based RICH detector prototype for the future ALICE~3 experiment

The ALICE Collaboration is proposing a completely new apparatus, ALICE~3, for the LHC Runs~5 and beyond. In this context, a key subsystem for high-energy charged particle identification will be a proximity-focusing ring-imaging Cherenkov detector using aerogel as radiator and silicon photomultipliers (SiPMs) as photon sensors. We assembled a small-scale prototype instrumented with Hamamatsu S13352 and S13361-3075AE-08 SiPM arrays, readout by custom boards equipped with front-end Petiroc 2A ASICs. The Cherenkov radiator consisted of a 2 cm thick hydrophobic aerogel tile with a refractive index of 1.03 separated from the SiPM plane by a 23 cm expansion gap. The prototype was successfully tested in a campaign at the CERN PS T10 beam line with the goal of validating the design bRICH specifications in terms to achieve the target separation power. We measured a single photon angular resolution of 3.8~mrad at the Cherenkov angle saturation value of 242~mrad, as well as the expected scaling of the angular resolution with the increasing number of detected photons. We also studied the contribution of uncorrelated and correlated background sources with respect to the signal and proved the effectiveness of time matching between charged tracks and photon hits to achieve efficient suppression of the SiPM dark count rate background. In this paper, the detector concept, the description of the tested prototype layout and the main beam test results are reported.

preprint2026arXiv

Development of a novel compact and fast SiPM-based RICH detector for the future ALICE 3 PID system at LHC

A dedicated R\&D is ongoing for the charged particle identification system of the \mbox{ALICE 3} experiment proposed for the LHC Run 5 and beyond. One of the subsystems for the high-energy charged particle identification will be a Ring-Imaging Cherenkov (RICH) detector. The possibility of integrating Cherenkov-based charged particle timing measurements is currently under study. The proposed system is based on a proximity-focusing RICH configuration including an aerogel radiator separated from a SiPM array layer by an expansion gap. A thin high-refractive index window of transparent material, acting as a second Cherenkov radiator, is glued on the SiPM array to enable time-of-flight measurements of charged particles by exploiting the yield of Cherenkov photons in the thin window. We assembled a small-scale prototype instrumented with different Hamamatsu SiPM array sensors with pitches ranging from 1 to 3 mm, readout by custom boards equipped with the front-end Petiroc 2A ASICs to measure charges and times. The primary Cherenkov radiator consisted of a 2 cm thick aerogel tile, while various window materials, including SiO$_2$ and MgF$_2$, were used as secondary Cherenkov radiators. The prototype was successfully tested in a campaign at the CERN PS T10 beam line with pions and protons. This paper summarizes the results achieved in the 2023 test beam campaign.

preprint2026arXiv

Test beam performance of a novel RICH detector with timing capabilities for the future ALICE~3 PID system at LHC

The ALICE Collaboration is proposing a completely new apparatus, ALICE 3, for the LHC Run 5 and beyond. A key subsystem for charged particle identification will be a Ring-Imaging Cherenkov (RICH) detector consisting of an aerogel radiator and a photosensitive surface based on Silicon Photomultiplier (SiPM) arrays in a proximity-focusing configuration. A thin high-refractive index slab of transparent material (window), acting as a second Cherenkov radiator, is glued on the entrance face of the SiPM arrays to achieve precise charged particle timing. Requiring time matching between aerogel Cherenkov photon and track hits leads to an improvement of pattern recognition by discarding the uncorrelated SiPM dark count hits. In this work we present the current status of the R\&D performed for the ALICE 3 RICH detector prototype and the expected full scale system performance. A special focus will be given to the beam test results obtained with a small-scale prototype instrumented with various array of Hamamatsu SiPMs with pitches ranging from 1 to 3 mm. The Cherenkov radiator consisted of a 2 cm thick aerogel tile with a refractive index of 1.03 at 400 nm wavelength. For timing measurements SiPM arrays coupled with two different window materials (SiO$_2$ and MgF$_2$) were used. The prototype was successfully tested in beam test campaigns at the CERN PS T10 beam line. The data were collected with a complete chain of front-end and readout electronics based on the Petiroc 2A and Radioroc 2 together with a picoTDC to measure charges and times. We measured a charged particle detection efficiency above 99\% and a single photon angular resolution better than 4.2 mrad at the Cherenkov angle saturation with a time resolution better than 70 ps for charged particles.

preprint2022arXiv

Quality Control of Mass-Produced GEM Detectors for the CMS GE1/1 Muon Upgrade

The series of upgrades to the Large Hadron Collider, culminating in the High Luminosity Large Hadron Collider, will enable a significant expansion of the physics program of the CMS experiment. However, the accelerator upgrades will also make the experimental conditions more challenging, with implications for detector operations, triggering, and data analysis. The luminosity of the proton-proton collisions is expected to exceed $2-3\times10^{34}$~cm$^{-2}$s$^{-1}$ for Run 3 (starting in 2022), and it will be at least $5\times10^{34}$~cm$^{-2}$s$^{-1}$ when the High Luminosity Large Hadron Collider is completed for Run 4. These conditions will affect muon triggering, identification, and measurement, which are critical capabilities of the experiment. To address these challenges, additional muon detectors are being installed in the CMS endcaps, based on Gas Electron Multiplier technology. For this purpose, 161 large triple-Gas Electron Multiplier detectors have been constructed and tested. Installation of these devices began in 2019 with the GE1/1 station and will be followed by two additional stations, GE2/1 and ME0, to be installed in 2023 and 2026, respectively. The assembly and quality control of the GE1/1 detectors were distributed across several production sites around the world. We motivate and discuss the quality control procedures that were developed to standardize the performance of the detectors, and we present the final results of the production. Out of 161 detectors produced, 156 detectors passed all tests, and 144 detectors are now installed in the CMS experiment. The various visual inspections, gas tightness tests, intrinsic noise rate characterizations, and effective gas gain and response uniformity tests allowed the project to achieve this high success rate.

preprint2021arXiv

Modeling the triple-GEM detector response to background particles for the CMS Experiment

An estimate of environmental background hit rate on triple-GEM chambers is performed using Monte Carlo (MC) simulation and compared to data taken by test chambers installed in the CMS experiment (GE1/1) during Run-2 at the Large Hadron Collider (LHC). The hit rate is measured using data collected with proton-proton collisions at 13 TeV and a luminosity of 1.5$\times10^{34}$ cm$^{-2}$ s$^{-1}$. The simulation framework uses a combination of the FLUKA and Geant4 packages to obtain the hit rate. FLUKA provides the radiation environment around the GE1/1 chambers, which is comprised of the particle flux with momentum direction and energy spectra ranging from $10^{-11}$ to $10^{4}$ MeV for neutrons, $10^{-3}$ to $10^{4}$ MeV for $γ$'s, $10^{-2}$ to $10^{4}$ MeV for $e^{\pm}$, and $10^{-1}$ to $10^{4}$ MeV for charged hadrons. Geant4 provides an estimate of detector response (sensitivity) based on an accurate description of detector geometry, material composition and interaction of particles with the various detector layers. The MC simulated hit rate is estimated as a function of the perpendicular distance from the beam line and agrees with data within the assigned uncertainties of 10-14.5%. This simulation framework can be used to obtain a reliable estimate of background rates expected at the High Luminosity LHC.

preprint2020arXiv

Interstrip Capacitances of the Readout Board used in Large Triple-GEM Detectors for the CMS Muon Upgrade

We present analytical calculations, Finite Element Analysis modeling, and physical measurements of the interstrip capacitances for different potential strip geometries and dimensions of the readout boards for the GE2/1 triple-Gas Electron Multiplier detector in the CMS muon system upgrade. The main goal of the study is to find configurations that minimize the interstrip capacitances and consequently maximize the signal-to-noise ratio for the detector. We find agreement at the 1.5--4.8% level between the two methods of calculations and on the average at the 17% level between calculations and measurements. A configuration with halved strip lengths and doubled strip widths results in a measured 27--29% reduction over the original configuration while leaving the total number of strips unchanged. We have now adopted this design modification for all eight module types of the GE2/1 detector and will produce the final detector with this new strip design.