Researcher profile

Alex Lu

Alex Lu contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
7topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2021arXiv

Power Off! Challenges in Planning and Executing Power Isolations on Shared-Use Electrified Railways

Electric railways are fast, clean, and safe, but complex to operate and maintain. Electric traction infrastructure includes signal power and feeder lines that remain live during isolations and complicate maintenance processes. Stakeholders involved in power outage planning include contractors, linemen, groundmen, power directors, dispatchers, conductor-flag, and support personnel. Weekly planning processes for track time requires many contingencies due to large number of moving parts and factors not known in advance, like personnel availability. Electrical and mechanical environments faced by crews working in adjacent areas may be entirely different and require a "bespoke" circuit configuration to de-energize catenary, which must be planned meticulously. Although recent automation improved real-time "plate order" communications between power directors and dispatchers, each outage still requires many manual switching operations. Net impact of this isolation process reduces available construction work windows nightly from a nominal 7 hours to 2 hrs 39 mins. We recommend joint design of electrical and civil infrastructure, cross-training between disciplines, limiting maximum number of concurrent outages, formal study of maintenance outage capacity, and further automation in power switching.

preprint2021arXiv

Rightsizing the Railway Signal Workforce: a Zero-Based Resourcing Approach Towards Asset Management

Classic asset management approaches begin by inventorying all infrastructure assets and then assigning maintenance tasks and resources. Our approach collects similar data, but by starting with current personnel assignment and describing their job responsibilities and work processes, staff resistance in a railroad infrastructure owner-operator environment is minimized. Resulting "manning model" quantitatively measures signal maintenance burden including Federally mandated tests, trouble tickets, non-FRA maintenance, overhead and vacation coverage, location/shift assignment, administrative process, and work curfew productivity losses. It is capable of delivering immediate results by rightsizing allocation of workforce across shifts and maintenance base locations--even before all assets are formally inventoried. Typical data from a commuter passenger railroad shows that work curfews and shift assignment constraints have significant impacts on workforce productivity. Just over half of signal maintenance employee-hours are devoted to Federally mandated tests, whilst non-FRA and repair maintenance consumes about 25% each. These indicators provide intelligence driving strategic management actions to improve signal maintenance cost-effectiveness. This model provides workload-based employee assignment by craft, location, gang, and shift for maintenance manager use, but also provides analytical basis for establishing or abolishing positions in the budgeting process. Comparing its results with current employee payroll provides a measure of how much staffing stress the maintenance organization is under, which can help measure whether the current overtime usage is appropriate. Asset and maintenance task inventories collected in this process can also feed normal asset management processes to assess replacement cycles, asset failure risk, and to inform strategic and investment decisions.

preprint2020arXiv

Improved Conditional Flow Models for Molecule to Image Synthesis

In this paper, we aim to synthesize cell microscopy images under different molecular interventions, motivated by practical applications to drug development. Building on the recent success of graph neural networks for learning molecular embeddings and flow-based models for image generation, we propose Mol2Image: a flow-based generative model for molecule to cell image synthesis. To generate cell features at different resolutions and scale to high-resolution images, we develop a novel multi-scale flow architecture based on a Haar wavelet image pyramid. To maximize the mutual information between the generated images and the molecular interventions, we devise a training strategy based on contrastive learning. To evaluate our model, we propose a new set of metrics for biological image generation that are robust, interpretable, and relevant to practitioners. We show quantitatively that our method learns a meaningful embedding of the molecular intervention, which is translated into an image representation reflecting the biological effects of the intervention.