Abstract
In 1976, Coffman and Sethi conjectured that a natural extension of LPT list scheduling to the bicriteria scheduling problem of minimizing makespan over flowtime optimal schedules, called LD algorithm, has a simple worst-case performance bound: (5m-2)/(4m-1), where m is the number of machines. We study structure of potential minimal counterexamples to this conjecture and prove that the conjecture holds for the cases (i) n > 5m, (ii) m = 2, (iii) m = 3, and (iv) m greater than or equal to 4, n less than or equal to 3m, where n is the number of jobs. We further conclude that to verify the conjecture, it suffices to analyze the following case: for every m greater than or equal to 4, n is either equal to 4m or 5m.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.