Abstract
It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with multi-gap resistive plate chamber (MRPC), aiming at overall time resolution about 80 ps. After the entire electronics system is ready, some experiments, such as heat radiating, irradiation hardness and large-current beam tests,are carried out to certify the electronics' reliability and stability. The on-detector test of the electronics is also performed with the beam at BEPCII E3 line, the test results indicate that the electronics system fulfills its design requirements.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.