Paper detail

The test of the electronics system for the BESIII ETOF upgrade

It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with multi-gap resistive plate chamber (MRPC), aiming at overall time resolution about 80 ps. After the entire electronics system is ready, some experiments, such as heat radiating, irradiation hardness and large-current beam tests,are carried out to certify the electronics' reliability and stability. The on-detector test of the electronics is also performed with the beam at BEPCII E3 line, the test results indicate that the electronics system fulfills its design requirements.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access11 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.