Paper detail

The opportunity offered by the ESSnuSB project to exploit the larger leptonic CP violation signal at the second oscillation maximum and the requirements of this project on the ESS accelerator complex

Very intense neutrino beams and large neutrino detectors will be needed to enable the discovery of CP violation in the leptonic sector. The European Spallation Source (ESS), currently under construction in Lund, Sweden, is a research center that will provide, by 2023, the world's most powerful neutron source. The average power will be 5 MW. Pulsing this linac at higher frequency, at the same instantaneous power, will make it possible to raise the average beam power to 10 MW to produce, in parallel with the spallation neutron production, a high performance neutrino Super Beam of about 0.4 GeV mean neutrino energy. The ESS neutrino Super Beam, ESSnuSB, operated with a 2.0 GeV linac proton beam, together with a large underground Water Cherenkov detector located at 540 km from Lund, close to the second oscillation maximum, will make it possible to discover leptonic CP violation at 5 sigma significance level in 56 percent (65 percent for an upgrade to 2.5 GeV beam energy) of the leptonic Dirac CP-violating phase range after 10 years of data taking. The paper gives an overview of the proposed facility and presents the outstanding physics reach possible for CP violation with ESSnuSB.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access8 authors3 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.