Paper detail

Speed-Robust Scheduling -- Sand, Bricks, and Rocks

The speed-robust scheduling problem is a two-stage problem where given $m$ machines, jobs must be grouped into at most $m$ bags while the processing speeds of the given $m$ machines are unknown. After the speeds are revealed, the grouped jobs must be assigned to the machines without being separated. To evaluate the performance of algorithms, we determine upper bounds on the worst-case ratio of the algorithm's makespan and the optimal makespan given full information. We refer to this ratio as the robustness factor. We give an algorithm with a robustness factor $2-1/m$ for the most general setting and improve this to $1.8$ for equal-size jobs. For the special case of infinitesimal jobs, we give an algorithm with an optimal robustness factor equal to $e/(e-1) \approx 1.58$. The particular machine environment in which all machines have either speed $0$ or $1$ was studied before by Stein and Zhong (SODA 2019). For this setting, we provide an algorithm for scheduling infinitesimal jobs with an optimal robustness factor of $(1+\sqrt{2})/2 \approx 1.207$. It lays the foundation for an algorithm matching the lower bound of $4/3$ for equal-size jobs.

preprint2022arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.