Abstract

The Superconducting Radio Frequency (SRF) system of the upgrade project of Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. The SRF system has accelerated both electron and positron at the design beam current of 910 mA successfully, and a high beam intensity colliding of 860 mA (electron)*910 mA (positron) has been achieved in April 2014. Many problems were encountered during the operation, among which some were solved and some remain unsolved. This paper will describe some experiences on BEPCII SRF system operation, including the symptoms, causes and solutions.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.