Security Constrained Unit Commitment with Corrective Transmission Switching

Traditionally, power system operations use a static network to deliver power and meet demand optimally. Network topology reconfiguration through transmission switching (TS) has gained significant interest recently to reduce the operational cost of power system operations. However, implementation of TS also causes large disturbance in the network and as a result the use of corrective transmission switching (CTS) in response to power system contingencies is currently being researched extensively. This paper emphasizes the importance of CTS to accomplish flexible transmission in N-1 security-constrained unit commitment (SCUC) model. An N-1 SCUC mathematical model implementing a dynamic network in the post-contingency scenario is proposed as opposed to current industry practices of static network in short-term operations. The proposed model is tested and validated on the IEEE 24-bus system. The proposed model results in cost-effective implementation and leads to overall reduced cost, and congestion reduction in the post-contingency scenario.

preprint2020arXivOpen access

Signal facts

What is known right now

Open access2 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.