Abstract

Given NN instances (X1,t1),…,(XN,tN)(X_1,t_1),\ldots,(X_N,t_N) of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers XiX_i has a subset that sums up to the target integer tit_i. We prove that this problem cannot be solved in time O~((N⋅tmax)1−ε)\tilde{O}((N \cdot t_{max})^{1-ε}), for tmax=max⁡itit_{max}=\max_i t_i and any ε>0ε> 0, assuming the ∀∃\forall \exists Strong Exponential Time Hypothesis (∀∃\forall \exists-SETH). We then use this result to exclude O~(n+Pmax⋅n1−ε)\tilde{O}(n+P_{max} \cdot n^{1-ε})-time algorithms for several scheduling problems on nn jobs with maximum processing time PmaxP_{max}, based on ∀∃\forall \exists-SETH. These include classical problems such as 1∣∣∑wjUj1||\sum w_jU_j, the problem of minimizing the total weight of tardy jobs on a single machine, and P2∣∣∑UjP_2||\sum U_j, the problem of minimizing the number of tardy jobs on two identical parallel machines.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.