Abstract
Renewable energy sources (RES) has gained a lot of interest recently. The limited transmission capacity serving RES often leads to network congestion since they are located in remote favorable locations. As a result, when poorly scheduled, the intermittent nature of RES may result in high curtailments of the free resource. Currently, grid operators utilize a static network when performing day-ahead scheduling and ignore transmission flexibility. This paper explores the possibility of utilizing network reconfiguration as a corrective action to reduce the transmission congestion and thereby the reduction of RES curtailments in day-ahead scheduling. To facilitate the RES integration in the grid, a stochastic N-1 security-constrained unit-commitment with corrective network reconfiguration (SSCUC-CNR) is modelled. SSCUC-CNR model is studied on a modified IEEE 24-bus system with RES. The simulation results demonstrate that CNR not only leads to a lower cost solution by reducing network congestion but also facilitates RES integration by reducing congestion-induced curtailments in high penetration cases. Emission studies demonstrate that more green generators are committed resulting in reduced carbon emissions when CNR is implemented.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.