Paper detail

Prototyping and qualification of 2S modules for the CMS Outer Tracker upgrade at the HL-LHC

In preparation for the High Luminosity LHC, the entire tracker detector of the CMS experiment will be exchanged as part of the Phase-2 Upgrade. The new Outer Tracker will comprise approximately 13,000 silicon sensor modules, of which 7608 are "2S modules" consisting of two parallel mounted silicon strip sensors, and 5592 are "PS modules" consisting of one pixel and one strip sensor in a single module. These modules provide tracking information to the Level 1 trigger by correlating the hit information of both sensor layers, allowing discrimination of particle tracks by their transverse momentum. To guarantee successful operation during data-taking, the production of the outer tracker modules has to fulfill strict requirements. This note will discuss the assembly procedures as well as some key results of the electronic, thermal and vibration tests performed at CERN for qualifying the 2S module design and for preparing the module assembly procedures.

preprint2021arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.