Paper detail

Proposal on Application of the Multi-Wire Proportional Chambers of the LHCb MUON Detector at Very High Rates for the Future Upgrades

The MUON Detector (MD) of LHCb is one of the largest instruments of this kind worldwide, and one of the most irradiated. It has performed exceptionally well during the RUN1 and RUN2 of the LHC at an instantaneous luminosity of 4$\times$10$^{32}$ cm$^{-2}$s$^{-1}$, with tracking inefficiencies at the level of 1$\%$ and 2.6$\%$, respectively. Looking forward for the future LHCb Upgrade 2 (U2) planned in 2031 and aiming in running the detector at increased luminosity by a factor $\sim$50, and at the same time keeping a very high ($\sim$99$\%$) detection efficiency, an option with reuse significant part of the present Multi-Wire Proportional Chambers (MWPC) in a new Muon System is presented. In addition, the first idea of new Front End Electronics (FEE) and an existing test setup applicable for designing both: new MWPCs with a higher granularity of the cathode readout pads and new FEE are described.

preprint2020arXivOpen access

Signal facts

What is known right now

Open access3 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.