Paper detail

Joint replenishment meets scheduling

In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing time, and it requires a subset of items. A job can be started at time $t$ only if all the required item types were replenished between the release date of the job and time point $t$. The ordering of item types for distinct jobs can be combined. The objective is to minimize the total ordering cost plus a scheduling criterion, such as total weighted completion time or maximum flow time, where the cost of ordering a subset of items simultaneously is the sum of a joint ordering cost, and an additional item ordering cost for each item type in the subset. We provide several complexity results for the offline problem, and competitive analysis for online variants with min-sum and min-max criteria, respectively.

preprint2022arXivOpen access

Signal facts

What is known right now

Open access4 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.