Source author record

Tamás Kis

Tamás Kis appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Joint replenishment meets scheduling

In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing time, and it requires a subset of items. A job can be started at time $t$ only if all the required item types were replenished between the release date of the job and time point $t$. The ordering of item types for distinct jobs can be combined. The objective is to minimize the total ordering cost plus a scheduling criterion, such as total weighted completion time or maximum flow time, where the cost of ordering a subset of items simultaneously is the sum of a joint ordering cost, and an additional item ordering cost for each item type in the subset. We provide several complexity results for the offline problem, and competitive analysis for online variants with min-sum and min-max criteria, respectively.

preprint2020arXiv

New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints

In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and replenishments arrive over time at a-priori known time points and quantities. The jobs have some requirements from the resources and a job can only be started if the available quantity from each of the required resources exceeds the requirements of the job. Upon starting a job, it consumes its requirements which decreases the available quantities of the respective non-renewable resources. There is a broad theoretical and practical background for this class of problems. Most of the literature concentrate on the makespan, and the maximum lateness objectives. This paper focuses on the total weighted completion time objective for which the list of the approximation algorithms is very short. In this paper we extend that list by considering new special cases and obtain new complexity results and approximation algorithms. We show that even if there is only a single non-renewable resource, and each job has unit weight and requires only one unit from the resource, the problem is still NP-hard, however, in our construction we need a high-multiplicity encoding of the jobs in the input. We also propose an FPTAS for a variant in which the jobs have arbitrary weights, and the number of supply time points is bounded by a constant. Finally, we prove some non-trivial approximation guarantees for simple greedy algorithms for some further variants of the problem.