Paper detail

Grid Integration Costs of Fluctuating Renewable Energy Sources

The grid integration of intermittent Renewable Energy Sources (RES) causes costs for grid operators due to forecast uncertainty and the resulting production schedule mismatches. These so-called profile service costs are marginal cost components and can be understood as an insurance fee against RES production schedule uncertainty that the system operator incurs due to the obligation to always provide sufficient control reserve capacity for power imbalance mitigation. This paper studies the situation for the German power system and the existing German RES support schemes. The profile service costs incurred by German Transmission System Operators (TSOs) are quantified and means for cost reduction are discussed. In general, profile service costs are dependent on the RES prediction error and the specific workings of the power markets via which the prediction error is balanced. This paper shows both how the prediction error can be reduced in daily operation as well as how profile service costs can be reduced via optimization against power markets and/or active curtailment of RES generation.

preprint2014arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.