Paper detail

Flexibility Management in Economic Dispatch with Dynamic Automatic Generation Control

As the installation of electronically interconnected renewable energy resources grows rapidly in power systems, system frequency maintenance and control become challenging problems to maintain the system reliability in bulk power systems. As two of the most important frequency control actions in the control centers of independent system operators (ISOs) and utilities, the interaction between Economic Dispatch (ED) and Automatic Generation Control (AGC) attracts more and more attention. In this paper, we propose a robust optimization based framework to measure the system flexibility by considering the interaction between two hierarchical processes (i.e., ED and AGC). We propose a cutting plane algorithm with the reformulation technique to obtain seven different indices of the system. In addition, we study the impacts of several system factors (i.e., the budget of operational cost, ramping capability, and transmission line capacity) and show numerically how these factors can influence the system flexibility.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.