Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS Phase-2 Muon System Upgrade

preprint2021arXivOpen access

Abstract

The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM Collaboration.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.