Paper detail

Determining the open pit to underground transition: A new method

Many Ore Reserves are harvested by a combination of open pit and underground mining methods. In these cases there is often material that could be mined by either method, and a choice has to be made. The area containing this material is referred to as the transition zone. Deciding where to finish the open pit and start the underground is referred to as the transition problem and it has received some attention in the literature since the 1980s. In this paper we provide a review of existing approaches to the transition problem encompassing: graph-theory based optimisation employing an opportunity cost approach; heuristics and integer programming. We also present a novel opportunity cost approach, allowing it to take into account a crown pillar, and show how the new approach can be best applied through the unconventional application of an existing mine optimisation tool.

preprint2016arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.