Researcher profile

D. A. Thomas

D. A. Thomas contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 21 - Emerging
7works
0followers
6topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

7 published item(s)

preprint2016arXiv

Determining the open pit to underground transition: A new method

Many Ore Reserves are harvested by a combination of open pit and underground mining methods. In these cases there is often material that could be mined by either method, and a choice has to be made. The area containing this material is referred to as the transition zone. Deciding where to finish the open pit and start the underground is referred to as the transition problem and it has received some attention in the literature since the 1980s. In this paper we provide a review of existing approaches to the transition problem encompassing: graph-theory based optimisation employing an opportunity cost approach; heuristics and integer programming. We also present a novel opportunity cost approach, allowing it to take into account a crown pillar, and show how the new approach can be best applied through the unconventional application of an existing mine optimisation tool.

preprint2015arXiv

Observations of 2D Doppler backscattering on MAST

The Synthetic Aperture Microwave Imaging (SAMI) diagnostic has conducted proof-of-principle 2D Doppler backscattering (DBS) experiments on MAST. SAMI actively probes the plasma edge using a wide (+-40 degrees vertical and horizontal) and tuneable (10-35.5 GHz) beam. The Doppler backscattered signal is digitised in vector form using an array of eight Vivaldi PCB antennas. This allows the receiving array to be focused in any direction within the field of view simultaneously to an angular range of 6-24 degrees FWHM at 10-34.5 GHz. This capability is unique to SAMI and is an entirely novel way of conducting DBS experiments. In this paper the feasibility of conducting 2D DBS experiments is explored. Initial measurements of phenomena observed on conventional DBS experiments are presented; such as momentum injection from neutral beams and an abrupt change in power and turbulence velocity coinciding with the onset of H-mode. In addition, being able to carry out 2D DBS imaging allows a measurement of magnetic pitch angle to be made; preliminary results are presented. Capabilities gained through steering a beam using a phased array and the limitations of this technique are discussed.

preprint2013arXiv

A geometric characterisation of the quadratic min-power centre

For a given set of nodes in the plane the min-power centre is a point such that the cost of the star centred at this point and spanning all nodes is minimised. The cost of the star is defined as the sum of the costs of its nodes, where the cost of a node is an increasing function of the length of its longest incident edge. The min-power centre problem provides a model for optimally locating a cluster-head amongst a set of radio transmitters, however, the problem can also be formulated within a bicriteria location model involving the 1-centre and a generalized Fermat-Weber point, making it suitable for a variety of facility location problems. We use farthest point Voronoi diagrams and Delaunay triangulations to provide a complete geometric description of the min-power centre of a finite set of nodes in the Euclidean plane when cost is a quadratic function. This leads to a new linear-time algorithm for its construction when the convex hull of the nodes is given. We also provide an upper bound for the performance of the centroid as an approximation to the quadratic min-power centre. Finally, we briefly describe the relationship between solutions under quadratic cost and solutions under more general cost functions.

preprint2013arXiv

Approximating Minimum Steiner Point Trees in Minkowski Planes

Given a set of points, we define a minimum Steiner point tree to be a tree interconnecting these points and possibly some additional points such that the length of every edge is at most 1 and the number of additional points is minimized. We propose using Steiner minimal trees to approximate minimum Steiner point trees. It is shown that in arbitrary metric spaces this gives a performance difference of at most $2n-4$, where $n$ is the number of terminals. We show that this difference is best possible in the Euclidean plane, but not in Minkowski planes with parallelogram unit balls. We also introduce a new canonical form for minimum Steiner point trees in the Euclidean plane; this demonstrates that minimum Steiner point trees are shortest total length trees with a certain discrete-edge-length condition.

preprint2012arXiv

The Gilbert Arborescence Problem

We investigate the problem of designing a minimum cost flow network interconnecting n sources and a single sink, each with known locations in a normed space and with associated flow demands. The network may contain any finite number of additional unprescribed nodes from the space; these are known as the Steiner points. For concave increasing cost functions, a minimum cost network of this sort has a tree topology, and hence can be called a Minimum Gilbert Arborescence (MGA). We characterise the local topological structure of Steiner points in MGAs, showing, in particular, that for a wide range of metrics, and for some typical real-world cost-functions, the degree of each Steiner point is 3.

preprint2011arXiv

The bottleneck 2-connected $k$-Steiner network problem for $k\leq 2$

The geometric bottleneck Steiner network problem on a set of vertices $X$ embedded in a normed plane requires one to construct a graph $G$ spanning $X$ and a variable set of $k\geq 0$ additional points, such that the length of the longest edge is minimised. If no other constraints are placed on $G$ then a solution always exists which is a tree. In this paper we consider the Euclidean bottleneck Steiner network problem for $k\leq 2$, where $G$ is constrained to be 2-connected. By taking advantage of relative neighbourhood graphs, Voronoi diagrams, and the tree structure of block cut-vertex decompositions of graphs, we produce exact algorithms of complexity $O(n^2)$ and $O(n^2\log n)$ for the cases $k=1$ and $k=2$ respectively. Our algorithms can also be extended to other norms such as the $L_p$ planes.

preprint2009arXiv

Designing Optimal Flow Networks

We investigate the problem of designing a minimum cost flow network interconnecting n sources and a single sink, each with known locations and flows. The network may contain other unprescribed nodes, known as Steiner points. For concave increasing cost functions, a minimum cost network of this sort has a tree topology, and hence can be called a Minimum Gilbert Arborescence (MGA). We characterise the local topological structure of Steiner points in MGAs for linear cost functions. This problem has applications to the design of drains, gas pipelines and underground mine access.