Paper detail

A note on the g and h control charts

In this note, we revisit the $g$ and $h$ control charts that are commonly used for monitoring the number of conforming cases between the two consecutive appearances of nonconformities. It is known that the process parameter of these charts is usually unknown and estimated by using the maximum likelihood estimator and the minimum variance unbiased estimator. However, the minimum variance unbiased estimator in the control charts has been inappropriately used in the quality engineering literature. This observation motivates us to provide the correct minimum variance unbiased estimator and investigate theoretical and empirical biases of these estimators under consideration. Given that these charts are developed based on the underlying assumption that samples from the process should be balanced, which is often not satisfied in many practical applications, we propose a method for constructing these charts with unbalanced samples.

preprint2021arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.