Paper detail

A framework for power line inspection tasks with multi-robot systems from signal temporal logic specifications

Inspection of power line infrastructures must be periodically conducted by electric companies in order to ensure reliable electric power distribution. Research efforts are focused on automating the power line inspection process by looking for strategies that satisfy different requirements expressed in terms of potential damage and faults detection. This problem comes up with the need of safe planning and control techniques for autonomous robots to perform visual inspection tasks. Such an application becomes even more interesting and of critical importance when considering a multi-robot extension. In this paper, we propose to compute feasible and constrained trajectories for a fleet of quad-rotors leveraging on Signal Temporal Logic (STL) specifications. The planner allows to formulate rather complex missions avoiding obstacles and forbidden areas along the path. Simulations results achieved in MATLAB show the effectiveness of the proposed approach leading the way to experimental tests on the hardware.

preprint2021arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.