Researcher profile

Yueqi Zhang

Yueqi Zhang contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2026arXiv

A Scheduling Framework for Efficient MoE Inference on Edge GPU-NDP Systems

Mixture-of-Experts (MoE) models facilitate edge deployment by decoupling model capacity from active computation, yet their large memory footprint drives the need for GPU systems with near-data processing (NDP) capabilities that offload experts to dedicated processing units. However, deploying MoE models on such edge-based GPU-NDP systems faces three critical challenges: 1) severe load imbalance across NDP units due to non-uniform expert selection and expert parallelism, 2) insufficient GPU utilization during expert computation within NDP units, and 3) extensive data pre-profiling necessitated by unpredictable expert activation patterns for pre-fetching. To address these challenges, this paper proposes an efficient inference framework featuring three key optimizations. First, the underexplored tensor parallelism in MoE inference is exploited to partition and compute large expert parameters across multiple NDP units simultaneously towards edge low-batch scenarios. Second, a load-balancing-aware scheduling algorithm distributes expert computations across NDP units and GPU to maximize resource utilization. Third, a dataset-free pre-fetching strategy proactively loads frequently accessed experts to minimize activation delays. Experimental results show that our framework enables GPU-NDP systems to achieve 2.41x on average and up to 2.56x speedup in end-to-end latency compared to state-of-the-art approaches, significantly enhancing MoE inference efficiency in resource-constrained environments.

preprint2026arXiv

On Time, Within Budget: Constraint-Driven Online Resource Allocation for Agentic Workflows

Agentic systems increasingly solve complex user requests by executing orchestrated workflows, where subtasks are assigned to specialized models or tools and coordinated according to their dependencies. While recent work improves agent efficiency by optimizing the performance--cost--latency frontier, real deployments often impose concrete requirements: a workflow must be completed within a specified budget and before a specified deadline. This shifts the goal from average efficiency optimization to maximizing the probability that the entire workflow completes successfully under explicit budget and deadline constraints. We study \emph{constraint-driven online resource allocation for agentic workflows}. Given a dependency-structured workflow and estimates of success rates and generation lengths for each subtask--model pair, the executor dynamically allocates models and parallel samples across simultaneously executable subtasks while managing the remaining budget and time. We formulate this setting as a finite-horizon stochastic online allocation problem and propose \emph{Monte Carlo Portfolio Planning} (MCPP), a lightweight closed-loop planner that directly estimates constrained completion probability through simulated workflow executions and replans after observed outcomes. Experiments on CodeFlow and ProofFlow demonstrate that MCPP consistently improves constrained completion probability over strong baselines across a wide range of budget--deadline constraints.