Source author record

Xiangchen Yang

Xiangchen Yang appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2016arXiv

The Superconducting Magnet for ADS Injection-I

The cryomodule I for ADS Injection-I had been designed, fabricated and online tested. The CM1 contains seven superconducting magnets, seven superconducting spoke cavities and seven beam position monitors. The superconducting magnet, which is a kind of multifunction magnet in a 170mm length axial space, contains a solenoid for beam focusing and two correctors for orbit correction. The design goals for the magnets are to meet the required integral field strength and to reduce the leakage field of less than 2 G at the nearby superconducting spoke cavities. The 2.1K, 31 mbar cryogenic system, where the magnets and spoke cavities shared with, force the magnet must select a kind of conduction cooled current leads. The first one of the batch magnets was tested in a vertical Dewar in HIT in July, 2014. The measurement results met the design requirements. Online operation of CM1 in September, 2015 showed that seven magnets can work at 230A under 4.2K and 2.1K respectively. This paper will present the magnet and current lead design, field measurement and the installation progress.

preprint2013arXiv

Field Measurement for Superconducting Magnets of ADS Injector I

The superconducting solenoid magnet prototype for ADS injection-I had been fabricated in Beijing Qihuan Mechanical and Electric Engineer Company and tested in Haerbin Institute of Technology (HIT) in Nov, 2012. Batch magnet production was processed after some major revision from the magnet prototype, they include: removing off the perm-alloy shield, extending the iron yoke, using thin superconducting cable, etc. The first one of the batch magnets was tested in the vertical Dewar in HIT in Sept. 2013. Field measurement was carried out at the same time by the measurement platform that seated on the top of the vertical Dewar. This paper will present the field measurement system design, measurement results and discussion on the residual field from the persistent current effect.