Researcher profile

Rongxing Hu

Rongxing Hu contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 19 - UnverifiedVerification L1Unclaimed author
5works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

5 published item(s)

preprint2026arXiv

HyMGP: A Customized MILP-Based Tool for Techno-Economic Planning of Islanded Microgrids

This paper presents a customized microgrid planning algorithm and tool, HyMGP, for remote sites in arid regions, which is formulated as a Mixed Integer Linear Programming (MILP) problem. HyMGP is compared with HOMER Pro to evaluate its performance in optimizing the sizing of microgrid components, including photovoltaic panels (PVs), vertical axis wind turbines (VAWTs), and battery energy storage systems (BESS), for remote and off-grid applications. The study focuses on a standalone microgrid in the Saudi Arabia, considering high solar irradiance, limited wind availability, and a constant load profile composed of continuous cathodic protection and daytime cooling. In the simulation environment, comparisons with HOMER solutions demonstrate the advantages of HyMGP, which provides optimal and more flexible solutions by allowing user-defined component specifications and strictly enforcing all constraints. Further analysis shows that incorporating wind turbines reduces the Net Present Cost (NPC) by decreasing the required PV and battery capacities. Increasing battery autonomy leads to a higher NPC in both PV-only and hybrid systems due to the need for larger storage. Finally, lithium iron phosphate (Li-ion LFP) batteries are found to be more cost effective than lead acid, offering lower NPCs due to their longer lifespan, deeper discharge capability, and fewer replacement cycles.

preprint2026arXiv

Stochastic Power-Water Coordination: Unlocking Flexibility in Hybrid RO Desalination Plants via Variable-Speed Pumps and Tank Mixing

Water desalination plants (DPs) are among the most critical infrastructures and largest electricity loads in water-scarce regions worldwide. Although reverse osmosis (RO) desalination is the most energy-efficient and dominant technology, it remains energy-intensive but can offer substantial flexibility potential for power systems. This paper proposes a coordinated operation framework for power systems and DPs that explicitly accounts for both systems' operational constraints and fully unlocks DP flexibility. To achieve this, a detailed DP model is developed, incorporating the characteristics of an actual high-pressure pump with variable-speed operation, on-off operation with flushing requirements, water quality constraints, and water dynamics and salt mixing in the storage tank. By proactively managing freshwater storage and tank salinity in a closed-loop coordinated scheduling framework, the operational flexibility of the DP is significantly enhanced. With appropriate simplification and linearization, the resulting coordinated scheduling problem is formulated as a tractable mixed-integer linear programming (MILP) model, and a two-step decomposed commitment-scheduling stochastic optimization (TDCSO) is proposed to efficiently address uncertainties. Case studies validate the proposed approach and demonstrate up to a 6% operating cost reduction.

preprint2022arXiv

Feeder Microgrid Management on an Active Distribution System during a Severe Outage

Forming a microgrid on a distribution system with large scale outage after a severe weather event is emerging as a viable solution to improve resiliency at the distribution level. This option becomes more attractive when the distribution system has high levels of distributed PV. The management of such feeder-level microgrid has however many challenges, such as limited resources that can be deployed on the feeder quickly, and the limited real-time monitoring and control on the distribution system. Effective use of the distributed PV is also challenging as they are not monitored and controlled. To handle these challenges, the paper proposes a 2-stage hierarchical energy management scheme to securely operate these feeder level micorgrids. The first stage of the scheme solves a sequential rolling optimization problem to optimally schedule the main resources (such as a mobile diesel generator and battery storage unit). The second stage adopts a dispatching scheme for the main resources to adjust the stage-1 set-points closer to real- time. The proposed scheme has unique features to assure that the scheme is robust under highly varying operating conditions with limited system observability: (i) an innovative PV forecast error adjustment and a dynamic reserve adjustment scheme to handle the extreme uncertainty on PV power output, and (ii) an intelligent fuel management scheme to assure that the resources are utilized optimally over the multiple days of the restoration period. The proposed algorithm is tested on sample system with real-time data. The results show that the proposed scheme performs well in maximizing service to loads by effective use of all the resources and by properly taking into account the challenging operating conditions.

preprint2022arXiv

SA-HMTS: A Secure and Adaptive Hierarchical Multi-timescale Framework for Resilient Load Restoration Using A Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMG is challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. This paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using newly obtained forecasts, followed by the RT dispatch stage. To make the dispatch decisions more secure and robust against forecast errors, a novel concept called delayed recourse is proposed. The methodology is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS/hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure CMG operation under numerous operating scenarios.

preprint2021arXiv

Hierarchical Multi-timescale Framework For Operation of Dynamic Community Microgrid

Distribution system integrated community microgrids (CMGs) can restore loads during extended outages. The CMG is challenged with limited resource availability, absence of a robust grid-support, and demand-supply uncertainty. To address these challenges, this paper proposes a three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs. The CMG's ability to dynamically expand its boundary to support the neighboring grid sections is also considered. The first stage solves a stochastic day-ahead (DA) scheduling problem to obtain referral plans for optimal resource rationing. The intermediate near real-time scheduling stage updates the DA schedule closer to the dispatch time, followed by the RT dispatch stage. The proposed methodology is validated via numerical simulations on a modified IEEE 123-bus system, which shows superior performance in terms of RT load supplied under different forecast error cases, outage duration scenarios, and against the traditionally used two-stage approach.