Researcher profile

Roman Plotnikov

Roman Plotnikov contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 19 - UnverifiedVerification L1Unclaimed author
5works
0followers
4topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

5 published item(s)

preprint2022arXiv

Constrained Shortest Path and Hierarchical Structures

The Constraint Shortest Path (CSP) problem is as follows. An $n$-vertex graph is given, each edge/arc assigned two weights. Let us call them "cost" and "length" for definiteness. Finding a min-cost upper-bounded length path between a given pair of vertices is required. The problem is NP-hard even when the lengths of all edges are the same. Therefore, various approximation algorithms have been proposed in the literature for it. The constraint on path length can be accounted for by considering one edge weight equals to a linear combination of cost and length. By varying the multiplier value in a linear combination, a feasible solution delivers a minimum to the function with new weights. At the same time, Dijkstra's algorithm or its modifications are used to construct the shortest path with the current weights of the edges. However, with insufficiently large graphs, this approach may turn out to be time-consuming. In this article, we propose to look for a solution, not in the original graph but specially constructed hierarchical structures (HS). We show that the shortest path in the HS is constructed with $O(m)$-time complexity, where $m$ is the number of edges/arcs of the graph, and the approximate solution in the case of integer costs and lengths of the edges is found with $O(m\log n)$-time complexity. The a priori estimate of the algorithm's accuracy turned out to depend on the parameters of the problem and can be significant. Therefore, to evaluate the algorithm's effectiveness, we conducted a numerical experiment on the graphs of roads of megalopolis and randomly constructed unit-disk graphs (UDGs). The numerical experiment results show that in the HS, a solution close to optimal one is built 10--100 times faster than in the methods which use Dijkstra's algorithm to build a min-weight path in the original graph.

preprint2020arXiv

A 3/2--approximation for big two-bar charts packing

We consider a Two-Bar Charts Packing Problem (2-BCPP), in which it is necessary to pack two-bar charts (2-BCs) in a unit-height strip of minimum length. The problem is a generalization of the Bin Packing Problem (BPP). Earlier, we proposed an $O(n^2)$-time algorithm that constructs the packing which length at most $2\cdot OPT+1$, where $OPT$ is the minimum length of the packing of $n$ 2-BCs. In this paper, we propose an $O(n^4)$-time 3/2-approximate algorithm when each BC has at least one bar greater than 1/2.

preprint2020arXiv

Optimal Investment in the Development of Oil and Gas Field

Let an oil and gas field consists of clusters in each of which an investor can launch at most one project. During the implementation of a particular project, all characteristics are known, including annual production volumes, necessary investment volumes, and profit. The total amount of investments that the investor spends on developing the field during the entire planning period we know. It is required to determine which projects to implement in each cluster so that, within the total amount of investments, the profit for the entire planning period is maximum. The problem under consideration is NP-hard. However, it is solved by dynamic programming with pseudopolynomial time complexity. Nevertheless, in practice, there are additional constraints that do not allow solving the problem with acceptable accuracy at a reasonable time. Such restrictions, in particular, are annual production volumes. In this paper, we considered only the upper constraints that are dictated by the pipeline capacity. For the investment optimization problem with such additional restrictions, we obtain qualitative results, propose an approximate algorithm, and investigate its properties. Based on the results of a numerical experiment, we conclude that the developed algorithm builds a solution close (in terms of the objective function) to the optimal one.

preprint2020arXiv

Two-Bar Charts Packing Problem

We consider a Bar Charts Packing Problem (BCPP), in which it is necessary to pack bar charts (BCs) in a strip of minimum length. The problem is, on the one hand, a generalization of the Bin Packing Problem (BPP), and, on the other hand, a particular case of the Project Scheduling Problem with multidisciplinary jobs and one limited non-accumulative resource. Earlier, we proposed a polynomial algorithm that constructs the optimal package for a given order of non-increasing BCs. This result generalizes a similar result for BPP. For Two-Bar Charts Packing Problem (2-BCPP), when each BC consists of two bars, the algorithm we have proposed constructs a package in polynomial time, the length of which does not exceed $2\ OPT+1$, where $OPT$ is the minimum possible length of the packing. As far as we know, this is the first guaranteed estimate for 2-BCPP. We also conducted a numerical experiment in which we compared the solutions built by our approximate algorithms with the optimal solutions built by the CPLEX package. The experimental results confirmed the high efficiency of the developed algorithms.

preprint2017arXiv

Convergecast with Unbounded Number of Channels

We consider a problem of minimum length scheduling for the conflict-free aggregation convergecast in wireless networks in a case when each element of a network uses its own frequency channel. This problem is equivalent to the well-known NP-hard problem of telephone broadcasting since only the conflicts between the children of the same parent are taken into account. We propose a new integer programming formulation and compare it with the known one by running the CPLEX software package. Based on the results of a numerical experiment, we concluded that our formulation is more preferable in practice to solve the considered problem by CPLEX than the known one. We also propose a novel heuristic algorithm, which is based on a genetic algorithm and a local search metaheuristic. The simulation results demonstrate the high quality of the proposed algorithm compared to the best known approaches.