Source author record

R. D'Arcy

R. D'Arcy appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

4works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

4 published item(s)

preprint2022arXiv

Longitudinally resolved measurement of energy-transfer efficiency in a plasma-wakefield accelerator

Energy-transfer efficiency is an important quantity in plasma-wakefield acceleration, especially for applications that demand high average power. Conventionally, the efficiency is measured using an electron spectrometer; an invasive method that provides an energy-transfer efficiency averaged over the full length of the plasma accelerator. Here, we experimentally demonstrate a novel diagnostic utilizing the excess light emitted by the plasma after a beam-plasma interaction, which yields noninvasive, longitudinally resolved measurements of the local energy-transfer efficiency from the wake to the accelerated bunch; here, as high as (58 $\pm$ 3)%. This method is suitable for online optimization of individual stages in a future multistage plasma accelerator, and enables experimental studies of the relation between efficiency and transverse instability in the acceleration process.

preprint2020arXiv

Matching small $β$ functions using centroid jitter and two beam position monitors

Matching to small beta functions is required to preserve emittance in plasma accelerators. The plasma wake provides strong focusing fields, which typically require beta functions on the mm-scale, comparable to those found in the final focusing of a linear collider. Such beams can be time consuming to experimentally produce and diagnose. We present a simple, fast, and noninvasive method to measure Twiss parameters in a linac using two beam position monitors only, relying on the similarity of the beam phase space and the jitter phase space. By benchmarking against conventional quadrupole scans, the viability of this technique was experimentally demonstrated at the FLASHForward plasma-accelerator facility.

preprint2015arXiv

Pxie low energy beam transport commissioning

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes' biases and chopper parameters.

preprint2015arXiv

Status of the warm front end of PXIE

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.