Source author record

A. Shemyakin

A. Shemyakin appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

19works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

19 published item(s)

preprint2022arXiv

Beam Dynamics Studies at the PIP-II Injector Test Facility

A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.

preprint2022arXiv

Experience With Machine Protection Systems At PIP2IT

The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$μ$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.

preprint2022arXiv

Finding Beam Loss Locations at PIP2IT Accelerator With Oscillating Dipole Correctors

The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H- beam to 16 MeV. To determine location of the beam loss in the accelerators low-energy part, where radiation monitors are ineffective, a method using oscillating trajectories was implemented. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync, produces a line at the corresponding frequency in spectra of BPM sum signals downstream of the loss point. Comparison of these responses along the beam line allows to find the loss location. The paper describes the method and results of its implementation at PIP2IT.

preprint2019arXiv

Measurements of a 2.1 MeV H$^-$ beam with an Allison scanner

Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action under linear optics makes it easier to compare measurements taken with different beamline conditions, e.g. in various locations. The intensity of a single measured point (\pixel") is proportional to the phase density in the corresponding portion of the beam. When the Twiss parameters are calculated using only the high-phase density part of the beam, the pixel intensity in the beam core is found to be decreasing exponentially with action and to be phase-independent. Outside of the core, the intensities decrease with action at a significantly slower rate than in the core. This `tail' comprises 10-30% of the beam, with 0.1% of the total measured intensity extending beyond the action 10-20 times larger than the rms emittance. The transition from the core to the tail is accompanied by the appearance of a strong phase dependence, which is characterized in action-phase coordinates by two `branches' extending beyond the core. A set of selected measurements shows, in part, that there is no measurable emittance dilution along the beam line in the main portion of the beam; the beam parameters are practically constant over a 0.5 ms pulse; and scraping in various parts of the beam line is an effective way to decrease the transverse tails by removing the branches.

preprint2015arXiv

High power density test of PXIE MEBT absorber prototype

One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a spot with a ~2 mm rms radius. Two prototypes of the absorber were manufactured from molybdenum alloy TZM and tested with a 28 keV DC electron beam up to the peak surface power density required for PXIE, 17W/mm2. Temperatures and flow parameters were measured and compared to analysis. This paper describes the absorber prototypes and key testing results.

preprint2015arXiv

Pxie low energy beam transport commissioning

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes' biases and chopper parameters.

preprint2015arXiv

Scheme for Low Energy Beam Transport with a non-neutralized section

A typical Low Energy Beam Transport (LEBT) design relies on dynamics with nearly complete beam space charge neutralization over the entire length of the LEBT. This paper argues that, for a beam with modest perveance and uniform current density distribution when generated at the source, a downstream portion of the LEBT can be un-neutralized without significant emittance growth.

preprint2015arXiv

Status of the warm front end of PXIE

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.

preprint2014arXiv

The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

preprint2013arXiv

Design of MEBT for the Project X Injector Experiment at Fermilab

The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by diverting undesired bunches to an absorber. This paper presents the MEBT scheme and describes development of its elements, including the kickers and absorber.

preprint2013arXiv

Progress with PXIE MEBT Chopper

A capability to provide a large variety of bunch patterns is crucial for the concept of the Project X serving MW-range beam to several experiments simultaneously. This capability will be realized by the Medium Energy Beam Transport's (MEBT) chopping system that will divert 80% of all bunches of the initially 5mA, 2.1 MeV CW 162.5 MHz beam to an absorber according to a pre-programmed bunch-by-bunch selection. Being considered one of the most challenging components, the chopping system will be tested at the Project X Injector Experiment (PXIE) facility that will be built at Fermilab as a prototype of the Project X front end. The bunch deflection will be made by two identical sets of travelling-wave kickers working in sync. Currently, two versions of the kickers are being investigated: a helical 200 Ohm structure with a switching-type 500 V driver and a planar 50 Ohm structure with a linear 250 V amplifier. This paper will describe the chopping system scheme and functional specifications for the kickers, present results of electromagnetic measurements of the models, discuss possible driver schemes, and show a conceptual mechanical design.

preprint2013arXiv

Project X: Accelerator Reference Design

Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility. Part 2 is available as arXiv:1306.5009 [hep-ex] and Part 3 is available as arXiv:1306.5024 [physics.acc-ph].

preprint2013arXiv

Summary of Fermilab's Recycler Electron Cooler Operation and Studies

Fermilab's Recycler ring was used as a storage ring for accumulation and subsequent manipulations of 8-GeV antiprotons destined for the Tevatron collider. To satisfy these missions, a unique electron cooling system was designed, developed and successfully implemented. The most important features that distinguish the Recycler cooler from other existing electron coolers are its relativistic energy (it employs a 4.3 MeV, 0.1 A DC electron beam), a weak continuous longitudinal magnetic field in the cooling section (~100 G), and lumped focusing elsewhere. With the termination of the collider operation at Fermilab, the cooler operation was also terminated. In this article, we will summarize the experience of commissioning, optimizing and running this unique machine over the 6 years of its existence.

preprint2013arXiv

The Recycler Electron Cooler

The Recycler Electron cooler was the first (and so far, the only) cooler working at a relativistic energy (γ = 9.5). It was successfully developed in 1995-2004 and was in operation at Fermilab in 2005-2011, providing cooling of antiprotons in the Recycler ring. This paper describes the cooler, difficulties in achieving the required electron beam parameters and the ways to overcome them, cooling measurements, and details of operation.

preprint2012arXiv

Effect of secondary ions on the electron beam optics in the Recycler Electron Cooler

Antiprotons in Fermilab's Recycler ring are cooled by a 4.3 MeV, 0.1 - 0.5 A DC electron beam (as well as by a stochastic cooling system). The unique combination of the relativistic energy (γ = 9.49), an Ampere - range DC beam, and a relatively weak focusing makes the cooling efficiency particularly sensitive to ion neutralization. A capability to clear ions was recently implemented by way of interrupting the electron beam for 1-30 \mus with a repetition rate of up to 40 Hz. The cooling properties of the electron beam were analyzed with drag rate measurements and showed that accumulated ions significantly affect the beam optics. For a beam current of 0.3 A, the longitudinal cooling rate was increased by factor of ~2 when ions were removed.

preprint2012arXiv

Low-Energy Run of Fermilab Electron Cooler's Beam Generation System

In the context of the evaluation of possibly using the Fermilab Electron Cooler for the proposed low-energy RHIC run at BNL, operating the cooler at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main conclusion of this feasibility study is that the cooler's beam generation system is suitable for BNL needs. The beam recirculation was stable for all tested parameters. In particular, a beam current of 0.38 A was achieved with the cathode magnetic field up to the maximum value presently available of 250 G. The energy ripple was measured to be 40 eV. A striking difference with running the 4.3 MeV beam (nominal for operation at FNAL) is that no unprovoked beam recirculation interruptions were observed.

preprint2012arXiv

Transverse Instabilities in the FERMILAB Recycler

Transverse instabilities of the antiproton beam have been observed in the Recycler ring soon after its commissioning. After installation of transverse dampers, the threshold for the instability limit increased significantly but the instability is still found to limit the brightness of the antiprotons extracted from the Recycler for Tevatron shots. In this paper, we describe observations of the instabilities during the extraction process as well as during dedicated studies. The measured instability threshold phase density agrees with the prediction of the rigid beam model within a factor of 2. Also, we conclude that the instability threshold can be significantly lowered for a bunch contained in a narrow and shallow potential well due to effective exclusion of the longitudinal tails from Landau damping.

preprint2012arXiv

Transverse instability of the antiproton beam in the Recycler Ring

The brightness of the antiproton beam in Fermilab's 8 GeV Recycler ring is limited by a transverse instability. This instability has occurred during the extraction process to the Tevatron for large stacks of antiprotons even with dampers in operation. This paper describes observed features of the instability, introduces the threshold phase density to characterize the beam stability, and finds the results to be in agreement with a resistive wall instability model. Effective exclusion of the longitudinal tails from Landau damping by decreasing the depth of the RF potential well is observed to lower the threshold density by up to a factor of two.