Source author record

Pitipong J. Lin

Pitipong J. Lin appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
2topics
1close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2021arXiv

Demand-Driven Asset Reutilization Analytics

Manufacturers have long benefited from reusing returned products and parts. This benevolent approach can minimize cost and help the manufacturer to play a role in sustaining the environment, something which is of utmost importance these days because of growing environment concerns. Reuse of returned parts and products aids environment sustainability because doing so helps reduce the use of raw materials, eliminate energy use to produce new parts, and minimize waste materials. However, handling returns effectively and efficiently can be difficult if the processes do not provide the visibility that is necessary to track, manage, and re-use the returns. This paper applies advanced analytics on procurement data to increase reutilization in new build by optimizing Equal-to-New (ETN) parts return. This will reduce 'the spend' on new buy parts for building new product units. The process involves forecasting and matching returns supply to demand for new build. Complexity in the process is the forecasting and matching while making sure a reutilization engineering process is available. Also, this will identify high demand/value/yield parts for development engineering to focus. Analytics has been applied on different levels to enhance the optimization process including forecast of upgraded parts. Machine Learning algorithms are used to build an automated infrastructure that can support the transformation of ETN parts utilization in the procurement parts planning process. This system incorporate returns forecast in the planning cycle to reduce suppliers liability from 9 weeks to 12 months planning cycle, e.g., reduce 5% of 10 million US dollars liability.