Researcher profile

Piotr Dziurzanski

Piotr Dziurzanski contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2020arXiv

Evolutionary Optimisation of Real-Time Systems and Networks

The design space of networked embedded systems is very large, posing challenges to the optimisation of such platforms when it comes to support applications with real-time guarantees. Recent research has shown that a number of inter-related optimisation problems have a critical influence over the schedulability of a system, i.e. whether all its application components can execute and communicate by their respective deadlines. Examples of such optimization problems include task allocation and scheduling, communication routing and arbitration, memory allocation, and voltage and frequency scaling. In this paper, we advocate the use of evolutionary approaches to address such optimization problems, aiming to evolve individuals of increased fitness over multiple generations of potential solutions. We refer to plentiful evidence that existing real-time schedulability tests can be used effectively to guide evolutionary optimisation, either by themselves or in combination with other metrics such as energy dissipation or hardware overheads. We then push that concept one step further and consider the possibility of using evolutionary techniques to evolve the schedulability tests themselves, aiming to support the verification and optimisation of systems which are too complex for state-of-the-art (manual) derivation of schedulability tests.

preprint2020arXiv

Multi-Objective Parameter-less Population Pyramid for Solving Industrial Process Planning Problems

Evolutionary methods are effective tools for obtaining high-quality results when solving hard practical problems. Linkage learning may increase their effectiveness. One of the state-of-the-art methods that employ linkage learning is the Parameter-less Population Pyramid (P3). P3 is dedicated to solving single-objective problems in discrete domains. Recent research shows that P3 is highly competitive when addressing problems with so-called overlapping blocks, which are typical for practical problems. In this paper, we consider a multi-objective industrial process planning problem that arises from practice and is NP-hard. To handle it, we propose a multi-objective version of P3. The extensive research shows that our proposition outperforms the competing methods for the considered practical problem and typical multi-objective benchmarks.

preprint2020arXiv

Value-driven Manufacturing Planning using Cloud-based Evolutionary Optimisation

This paper considers manufacturing planning and scheduling of manufacturing orders whose value decreases over time. The value decrease is modelled with a so-called value curve. Two genetic-algorithm-based methods for multi-objective optimisation have been proposed, implemented and deployed to a cloud. The first proposed method allocates and schedules manufacturing of all the ordered elements optimising both the makespan and the total value, whereas the second method selects only the profitable orders for manufacturing. The proposed evolutionary optimisation has been performed for a set of real-world-inspired manufacturing orders. Both the methods yield a similar total value, but the latter method leads to a shorter makespan.