Researcher profile

Navid Ebrahimi

Navid Ebrahimi contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 11 - UnverifiedVerification L1Unclaimed author
1works
0followers
2topics
3close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2026arXiv

Bayesian-Monte Carlo Schedule Updating for Construction Digital Twins: A Probabilistic Framework for Dynamic Project Forecasting

Construction projects frequently experience schedule delays and forecasting uncertainty due to variability in labor productivity, material availability, weather conditions, and project coordination. Conventional deterministic scheduling methods such as the Critical Path Method (CPM) assume fixed activity durations and therefore cannot adequately represent dynamic project uncertainty. This study presents a Bayesian-Monte Carlo probabilistic schedule updating framework for construction digital twin environments. The proposed methodology integrates stochastic activity-duration modeling, Bayesian recursive updating, Monte Carlo simulation, and uncertainty propagation within a unified computational framework for adaptive schedule forecasting. Activity durations are modeled using lognormal probability distributions and continuously updated through Bayesian inference as new project observations become available. Monte Carlo simulation is then used to propagate updated uncertainty throughout project networks and generate probabilistic completion-time forecasts, delay-risk estimates, and activity criticality measures. Simulation experiments using PSPLIB benchmark project networks demonstrate that the proposed framework improves forecasting accuracy and uncertainty representation compared with deterministic CPM and static probabilistic scheduling approaches. The framework further supports adaptive project forecasting through integration of BIM reports, drone observations, IoT telemetry, productivity logs, and site monitoring data.