Source author record

Matthias Silbernagl

Matthias Silbernagl appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

3works
1topics
2close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2015arXiv

Improving Accuracy and Efficiency of Start-up Cost Formulations in MIP Unit Commitment by Modeling Power Plant Temperatures

This paper presents an improved mixed-integer model for the Thermal Unit Commitment Problem. By introducing new variables for the temperature of each thermal unit, the off-time-dependent start-up costs are modeled accurately and with a lower integrality gap than state-of-the-art formulations. This new approach significantly improves computational efficiency compared to existing formulations, even if they only model a rough approximation of the start-up costs. Our findings were validated on real-world test cases using CPLEX.

preprint2015arXiv

The Summed Start-up Costs in a Unit Commitment Problem

We consider the sum of the incurred start-up costs of a single unit in a Unit Commitment problem. Our major result is a correspondence between the facets of its epigraph and some binary trees for concave start-up cost functions CU, which is bijective if CU is strictly concave. We derive an exponential H-representation of this epigraph, and provide an exact linear separation algorithm. These results significantly reduce the integrality gap of the Mixed Integer formulation of a Unit Commitment Problem compared to current literature.

preprint2014arXiv

Implementing a Unit Commitment Power Market Model in FICO Xpress-Mosel

Starting from a basic Unit Commitment problem as published in [Carrión2006], we develop a fully functional, running implementation for Xpress Mosel, useable in power market modeling. The constraints of the model are discussed in details and solutions to left open implementation problems are presented, guidelines on how to handle data input (from both, databases and Excel), as well as data output (to Excel) are given.