Source author record

Luca Paoli

Luca Paoli appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
2topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2022arXiv

Tunnel configurations and seismic isolation optimization in underground gravitational wave detectors

Gravitational wave detectors like the Einstein Telescope will be built a few hundred meters under Earth's surface to reduce both direct seismic and Newtonian noise. Underground facilities must be designed to take full advantage of the shielding properties of the rock mass to maximize the detector's performance. A major issue with the Einstein Telescope design are the corner points, where caverns need to be excavated in stable, low permeability rock to host the sensitive measurement infrastructure. This paper proposes a new topology that moves the top stages of the seismic attenuation chains and Michelson beam re-combination in separate excavations far from the beam-line and equipment induced noise while the test mass mirrors remain in the main tunnels. Distributing the seismic attenuation chain components over multiple tunnel levels allows the use of arbitrarily long seismic attenuation chains that relegate the seismic noise at frequencies completely outside the low-frequency noise budget, thus keeping the door open for future Newtonian noise suppression methods. Separating the input-output and recombination optics of different detectors into separate caverns drastically improves the observatory detection efficiency and allows staged commissioning. The proposed scheme eliminates structural and instrumentation crowding while the reduced sizes of excavations require fewer support measures.