Researcher profile

Kiichi Goto

Kiichi Goto contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
1topics
3close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

Analysis of SiW-ECAL technological prototype beam test with electron beam

The beam test for the SiW-ECAL technological prototype was conducted using electron beam in June-July 2019 at DESY test beam facility in Hamburg, Germany. In the beam test, there were two main programs: MIP program (without tungsten) and shower program (with tungsten). The purposes of the MIP program are energy calibration, pedestal uniformity/stability assessment, TDC operation test, and retrigger verification. On the other hand, the shower program aims to evaluate energy resolution through beam energy measurement. In addition, several operation tests with FEV13 were also conducted such as individual threshold control and auto gain mode. This article presents the performance of the technological prototype of SiW-ECAL, mainly focusing on the version of FEV13-Jp.

preprint2020arXiv

Preparation and operation of SiW-ECAL technological prototype for DESY test beam 2019

We are developing SiW-ECAL technological prototypes with the aim of optimizing readout structure for $e^+e^-$ linear collider application. Developments are being carried out under the cooperation of LAL, LLR and Kyushu University. In this paper, we report the development status of FEV13, the latest version of the technological prototypes, following improvements from the previous versions. Several beam tests have been conducted so far for this FEV13 performance test. Most recently, beam test was conducted with electron beam (1-5 GeV) at DESY in Germany from June to July 2019. We mainly report on the setup and various operation tests of FEV13 during this beam test.