Researcher profile

Isildinha M. Reis

Isildinha M. Reis contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
2topics
2close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

ABCMETAapp: R Shiny Application for Simulation-based Estimation of Mean and Standard Deviation for Meta-analysis via Approximate Bayesian Computation (ABC)

Background and Objective: In meta-analysis based on continuous outcome, estimated means and corresponding standard deviations from the selected studies are key inputs to obtain a pooled estimate of the mean and its confidence interval. We often encounter the situation that these quantities are not directly reported in the literatures. Instead, other summary statistics are reported such as median, minimum, maximum, quartiles, and study sample size. Based on available summary statistics, we need to estimate estimates of mean and standard deviation for meta-analysis. Methods: We developed a R Shiny code based on approximate Bayesian computation (ABC), ABCMETA, to deal with this situation. Results: In this article, we present an interactive and user-friendly R Shiny application for implementing the proposed method (named ABCMETAapp). In ABCMETAapp, users can choose an underlying outcome distribution other than the normal distribution when the distribution of the outcome variable is skewed or heavy tailed. We show how to run ABCMETAapp with examples. Conclusions: ABCMETAapp provides a R Shiny implementation. This method is more flexible than the existing analytical methods since estimation can be based on five different distribution (Normal, Lognormal, Exponential, Weibull, and Beta) for the outcome variable.

preprint2015arXiv

Simulation-based Estimation of Mean and Standard Deviation for Meta-analysis via Approximate Bayesian Computation (ABC)

Background: When conducting a meta-analysis of a continuous outcome, estimated means and standard deviations from the selected studies are required in order to obtain an overall estimate of the mean effect and its confidence interval. If these quantities are not directly reported in the publications, they need to must be estimated from other reported summary statistics, such as the median, the minimum, the maximum, and quartiles. Methods: We propose a simulation-based estimation approach using the Approximate Bayesian Computation (ABC) technique for estimating mean and standard deviation based on various sets of summary statistics found in published studies. We conduct a simulation study to compare the proposed ABC method with the existing methods of Hozo et al. (2005), Bland (2015), and Wan et al. (2014). Results: In the estimation of the standard deviation, our ABC method performs best in skewed or heavy-tailed distributions. The average relative error (ARE) approaches zero as sample size increases. In the normal distribution, our ABC performs well. However, the Wan et al. method is best since it is based on the normal distribution assumption. When the distribution is skewed or heavy-tailed, the ARE of Wan et al. moves away from zero even as sample size increases. In the estimation of the mean, our ABC method is best since the AREs converge to zero. Conclusion: ABC is a flexible method for estimating the study-specific mean and standard deviation for meta-analysis, especially with underlying skewed or heavy-tailed distributions. The ABC method can be applied using other reported summary statistics such as the posterior mean and 95% credible interval when Bayesian analysis has been employed.